JUMP FORM SYSTEM

Connectrix's automatic Jump Form System offers a superior design and method to form building cores faster than any other system available today. Through effective design, we save our clients millions over time by offering a method that consistently reduces program times and ensures projects stay ahead of the critical path.

Our shutters are made from 6061-T6 aluminum and don’t require any additional fixing. Steel components are high-quality 275-grade UB/UC sections. Jacking components are manufactured in the United Kingdom and are CE certified and rated to last 1000’s operations with minimal maintenance. Our electrical boards are assembled utilizing high-quality and reliable Schneider components. We recommend Swann bolts from the USA and VSL tie rods.

Our Jump-form system is designed for buildings that have been deemed of high importance and should be the first choice for any construction or formwork company wanting to ensure program efficiency and high levels of detail and safety. Each System is designed to fit its intended project to the millimeter. A level of detail not seen in any other system in the market. This level of accuracy allows our system to drastically reduce the time required to assemble, commission, jump and conduct wall changes throughout the life of the Jump-form while in operation.

Benefits of Jump Form System:

• The set-up time will be significantly less than the traditional systems.
• Complete jumping and leveling takes less than 60 minutes.
• Jumping can commence when concrete strength is 8Mpa rather than 25Mpa that other systems require.
• Not having trailing decks means the following slabs can be within 1 floor of the system rather than 3.
• No cast in or lost items required.
• The tower crane is not required once the system is commissioned.
• Requires less than 50% of the labor to operate. The savings in labor will be greater than the cost of the system.
• No open edges at any time during the operation. Safety is of paramount importance in our projects.
• Robustness. The accuracy of the core wall is almost perfect.
• Our system sits the concrete placing boom on top of the rig. This eliminates penetrations through the slabs below and removes the time-consuming process of jumping the placing boom.
• Toilet, workshop, and office facilities can be placed on if desired.
• Emergency access stairs are provided to follow all safety rules and regulations. These stairs are connected to the system so the labor-intensive exercise of erecting and dismantling is removed.
• Professional Client and Builder Advertising to be placed on a very Professional looking system.